Nationarl Army Volunteer Center

Nationarl Army Volunteer Center

Project Description

Contract Number:   W5J9JE-12-C-0033
Contract Title:   Nationarl Army Volunteer Center
Location: Kapisa Province, Afghanistan
Prime Contractor: Behnam Construction Company

This $281,547.19 is defined as the design, labor, equipment, and material to demolish and construct buildings, utilities, and other site infrastructure at the Kapisa NAVC. The project site is located in Mahmood-e-Raqi, Afghanistan.

ANP UP District HQ Subsation

ANP UP District HQ Subsation

Project Description

Contract Number:   W5J9JE-12-C-0149
Contract Title:   ANP UP District HQ Subsation
Prime Contractor: Behnam Construction Company

The project $1,616,646.32 consist of design and construction of a new UP District Headquarter Substation for the Afghan National Police (ANP) in Nayak Yakawlang District, Bamyan Province, Afghanistan. This project was successfully completed in one of the toughest regions in Afghanistan taking into consideration the logistical difficulties and weather.

This project consisted of design and construction of and adminstration building, kitchen annex, guard shack, perimeter wall and guard towers.

IDIQ MATOC Region III

Project Description

Contract Number:   W5J9JE-12-D-0020
Contract Title:   IDIQ MATOC Region III
Prime Contractor: Behnam Construction Company

This $45,000,000.00 IDIQ MATOC project is for the design and construction of the Afghanistan National Security Forces (ANSF) construction projects in Region III which inculdes the provinces of Khost, Paktiya, Logar, Paktika, Ghazni, Wardak, Kabul and Bamyan for a performance period of 2 years.

4CDO to SOK Conversion

4CDO to SOK Conversion

4CDO to SOK Conversion

Project Description

Contract Number:   W5J9LE-13-C-0020
Contract Title:   4CDO to SOK Conversion
Prime Contractor: Behnam Construction Company

This project consists of site adaption and construction of the Afghanistan National Army (ANA), 4CDO to SOK Conversion. Base Shindand, Herat Province, Afghanistan. The project consists of site adaption and construction of the site and new permanent facilities. The project is defined as providing but not limited to site adaption, material, labor, and equipment to construct buildings, parking areas, isolated site lighting and utilities. The intent is to provide permanent basing using the most cost-efficient and expeditious construction method.

Construction of Dog Kennel, US Embass

Construction of Dog Kennel, US Embass

Construction of Dog Kennel, US Embass

Project Description

Contract Number:   PR3920687
Contract Title:   Construction of Dog Kennel, US Embass
Contract:   BCC-ACLS JV
Prime Contractor: Behnam Construction Company

The Contractor shall furnish and install all materials required by this contract. The project mainly included demolition and renovation of the existing Dog Kennel in US Embassy in Kabul.

The major scope of work can be desribed as following:

  • Removal of roof on expansion side back to the ridge cap.
  • Remove existing kennel structure
  • Removal of all HESCO barriers currently used and replace with 12’ (3.65m) High T-Walls per attached drawing.
  • Install 2 each 40’ containers spaced 2.43m apart and construct 8 kennels within each container
  • Install new vertical roof supports, roof trusses and sheet metal
  • The contractor shall provide a design with details of the kennels, utilities and force protection.
Behnam Construction Company

Uniformed Police District Headquarters

Behnam Construction Company

Project Description

Contract Number:   W5J9JE-11-C-0018
Contract Title:   (ANP) Uniformed Police District Headquarters
Location:   Sorobi District, Kabul Province, Afghanistan
Completion Date: 30 June 2012

This $1,818,663.00 project consists of the design and construction of Afghanistan National Police (ANP) Uniformed Police District Headquarters facilities (approximately 650 SM in size located at Sorobi, Kabul Province, Afghanistan. This project is defined as the management, planning, design; material, labor, and equipment, to site adapt and construct all utilities, vehicular access, buildings, force protection measures, site security, de-mining activities, and other features as referenced herein. The work within this contract shall meet and be constructed in accordance with current U.S.design and International Building Codes (IBC), Life Safety Codes (NFPA-101), Force Protection and security standards. A partial listing of references is: IBC, International Building Codes 2006 NFPA 101, Life Safety Codes UFC 4-010-01, DoD Minimum Anti-Terrorism Standards for Buildings.

Behnamcc

Northern Region Logistics Hub in Nangarhar

Behnamcc

Project Description

Contract Number: W912BU-12-C-0057
Contract Title: Northern Region Logistics Hub
Location: Camp Marmal, Mazar-e-Sharif, Afghansitan
Prime Contractor: Behnam Construction Company

This $16,207,439.75 project consists of design and construction of a new Jalalabad Air Detachment for the Afghan National Army (ANA) in Nangarhar Province, Afghanistan.

The project consists of design, site adaption and construction of new permanent facilities for the FORWARD OPERATING BASE in Jalalabad Airfield for the ANA in Afghanistan. The project is defined as the design, labor and equipment to construct buildings, roads, parking, utilities and other infrastructure, of a design population of approximately 570 personnel.

Entry Control Point
Fuel Storage Depot
Roads, Logistical Area
HAZMAT Storage Area
Convoy Staging Area In-Bound/Out-Bound
Call Forward Yard and,
Groundwater well, Pumping, Storage and Disinfection Facility

Behanmcc.com

ANCOP Patrol Battalion in Baghlan Province

Project Description

Contract Number:   W5J9JE-11-C-0139
Contract Title:   ANCOP Patrol Battalion
Location:   Baghlan Province, Afghanistan
Prime Contractor: Behnam Construction Company

This $11,677,426.01 project consists design and construction of site improvements and construction of facilities to support the Afghan National Police (ANP) Units: ANCOP Patrol Battalion located in Markazai District, Baghlan province, Afghanistan. This project is for one battalion compound: the ANCOP Patrol Battalion. This project is defined as the management, design, materials, labor and equipment to design and construct and/or refurbish all utilities, road, buildings, force protection measures, site security, de-mining activities and other features.

Behnam Construction Company

Afghan Air Force (AAF) Jalalabad Air Detachment

Behnam Construction Company

Project Description

Contract Number:   W912DS-13-C-0005
Contract Title:   Afghan Air Force (AAF) Jalalabad Air Detachment
Prime Contractor: Behnam Construction Company

This $16,207,439.75 project consists of design and construction of a new Jalalabad Air Detachment for the Afghan National Army (ANA) in Nangarhar Province, Afghanistan.

The project consists of design, site adaption and construction of new permanent facilities for the FORWARD OPERATING BASE in Jalalabad Airfield for the ANA in Afghanistan. The project is defined as the design, labor and equipment to construct buildings, roads, parking, utilities and other infrastructure, of a design population of approximately 570 personnel.

Behnam Counstruction Company

Rushmore South Infantry Kandak

Project Description

Contract Number:   W912DS-12-C-0010
Contract Title:   Rushmore South Infantry Kandak
Prime Contractor: Behnam Construction Company

This $28,369,159.82 project consists of design and construction of a new Infantry Kandak for the Afghan National Army (ANA) in Rushmore South District, Paktika Province, Afghanistan, composed of one Infantry Kandak and all associated appurtenances as possible to include utilities infrastructures. The project is defined as materials, labor and equipment to construct buildings, parking, utilities, and other infrastructure for a design population of approximately 802 personnel.